Opens in a new tab

POWER PLANT EMISSION CONTROL

Power Plant Flue Gas Treatment Solutions for Dust and NOx Control

Solve particulate emissions, unstable baghouse pressure drop, short filter-bag life and SCR performance loss with one engineering review of the fuel, gas path and operating envelope.

Compliance focus

Particulate + NOx

Operating focus

Pressure drop + ammonia slip

Asset focus

Bag life + catalyst activity

Project focus

New build + retrofit + outage

THE COMPLETE GAS PATH

Treat the boiler, SCR and particulate-control system as one operating chain

A change upstream can create a failure downstream. Fuel variability, temperature, SOx, moisture, dust loading and reagent control should be reviewed together before changing filter media or catalyst.

01

Boiler & fuel

Load profile, fuel quality, combustion and ash characteristics

02

SCR denitration

Temperature window, NOx conversion, ammonia slip, poisoning and plugging

03

Particulate control

Dust loading, filtration velocity, pressure drop, cleaning and bag integrity

04

Stack performance

Plant emission target, monitoring trend, operating stability and evidence

Important: Equipment order and gas conditions vary by plant. The final recommendation must follow the actual process diagram and measured operating data.

PROBLEM-LED DIAGNOSIS

Start with the symptom the plant team is trying to eliminate

The first recommendation should be a test or data review—not an immediate product substitution. Use the rows below to narrow the mechanism before selecting bags, catalyst or operating changes.

Observed problem

Check first

Mechanism to confirm

Solution direction

Particulate emissions rise

Outlet trend, leak location, bag inspection, seals and cages

Bag damage, poor fit, seam failure, bypass or cleaning damage

Locate the failure mode; correct fit, construction, installation or operating cause

Baghouse pressure drop rises

DP trend, cleaning frequency, dew-point margin, hopper and dust release

Condensation, blinding, cleaning imbalance, high loading or low permeability

Stabilize the process and cleaning; then verify media structure and finish

Filter-bag life is shorter than planned

Failure position, used-bag condition, temperature and chemistry history

Thermal attack, oxidation, hydrolysis, chemical attack, abrasion or mechanical damage

Specify fibre, scrim, finish, membrane and construction against the confirmed mechanism

NOx conversion falls

SCR inlet/outlet NOx, temperature, ammonia slip, layer DP and operating hours

Activity loss, poisoning, erosion, plugging, flow or ammonia-distribution problem

Test representative catalyst and review operating conditions before replacement

Ammonia slip or ABS risk increases

NH3/NOx control, temperature profile, SO2/SO3 and air-preheater trend

Poor distribution, low activity, low-temperature operation or excess injection

Coordinate catalyst condition, flow field and reagent control

Fuel, load or process changes

New fuel analysis, load profile, gas chemistry, dust and temperature envelope

The original design basis no longer represents current operation

Recalculate the operating envelope and revalidate both filtration and SCR

CHOOSE THE RIGHT PROJECT PATH

Different situations need different engineering deliverables

A quotation is useful only when it is tied to the plant’s decision stage. Select the path that matches the work now.

NEW BUILD / RETROFIT

Build a design basis before procurement

For a new unit, fuel conversion, capacity increase or emission upgrade.

✓ Process and emission target review
✓ Baghouse and SCR interface assumptions
✓ Preliminary product specification
✓ Drawing and installation data checklist

Prepare design data

OPERATING PROBLEM

Find the failure mechanism before replacement

For rising emissions, DP, bag failures, low NOx removal or high ammonia slip.

✓ Trend and alarm review
✓ Used bag or catalyst sample inspection
✓ Root-cause hypothesis and confirmation plan
✓ Corrective action priority

Start troubleshooting

PLANNED OUTAGE

Reduce uncertainty before the shutdown window

For bag changeout, catalyst management or inspection planning.

✓ Quantity and dimension confirmation
✓ Remaining-life or activity evidence
✓ Packing and installation sequence
✓ Post-startup monitoring checklist

Plan the outage

ENGINEERED SOLUTION MODULES

Products are selected inside the system solution—not as isolated catalogue items

The final scope may include one module or a coordinated combination, depending on the confirmed cause and project objective.

PARTICULATE CONTROL

Filter bags and complete bag specification

For coal-fired, biomass and waste-to-energy baghouses where emission stability, pressure drop and service life must be balanced.

Fibre and scrim

Membrane / surface finish

Weight, permeability and thickness

Dimensions, seams, cuff and bottom

Cage fit and installation

NOx CONTROL

SCR catalyst selection and lifecycle support

For catalyst replacement, performance decline, ammonia-slip control and retrofit decisions across the actual operating temperature and gas chemistry.

Catalyst formulation

Pitch, wall thickness and module size

Activity and pressure-loss basis

Poisoning / plugging review

Testing, regeneration or replacement route

System coordination matters

SCR operation can change downstream gas temperature, chemistry and deposit behavior; baghouse operation can affect plant draft and energy use. Review interface risks before optimizing either component alone.

DATA REQUIRED FOR A DEFENSIBLE RECOMMENDATION

Send evidence that describes normal, peak and upset conditions

Single-point design values often hide the event that causes failure. Trends, ranges and the exact measurement basis are more useful than a product name alone.

01

Process and gas data

• Unit and fuel type
• Gas volume / load range
• Normal, peak and upset temperature
• Moisture, O₂, SOx and dust
• Inlet and target emission basis

02

Equipment and operating data

• Process flow diagram
• Baghouse or SCR drawings
• Cleaning / ammonia-injection logic
• Differential-pressure trends
• Dimensions, quantity and outage window

03

Failure and verification evidence

• Emission and alarm trends
• Photos and failure locations
• Used bag or catalyst samples
• Service history and previous changes
• Laboratory or field test reports

WHAT THE ENGINEERING REVIEW SHOULD PRODUCE

Trust comes from traceable decisions and clear acceptance criteria

01

Design-basis summary

The operating envelope, assumptions and missing data are stated before the product recommendation.

02

Complete specification

Material or catalyst details, dimensions, construction, interfaces and quantities are documented.

03

Verification plan

Inspection, testing, acceptance basis and evidence required from both supplier and plant are agreed.

04

Lifecycle follow-up

Installation observations and post-startup trends are used to confirm performance and guide future maintenance.

TECHNICAL RESOURCES

Use deeper guides when the issue requires specialist review

Power plant SCR catalyst selection and failure mechanisms

Review composition, deactivation, regeneration and selection factors.

Read the technical guide →

SCR catalyst lifecycle management

Understand activity loss, ammonia slip, inspection and replacement planning.

Read the technical guide →

WESP operating failures and troubleshooting

A supporting guide for plants using wet electrostatic polishing downstream.

Read the technical guide →

POWER PLANT FAQ

Questions plant teams ask before committing to a solution

Should we replace filter bags immediately when emissions rise?

Not until the leak path and failure mechanism are checked. A fit, seal, cage, installation or operating problem can persist after installing new bags.

Can one filter-bag specification cover every generating unit?

Only when the fuel, gas-treatment route, operating envelope, equipment and failure history are demonstrated to be equivalent.

When should SCR catalyst be tested?

Testing is useful when NOx conversion declines, ammonia slip or pressure loss rises, the operating window changes, or a replacement/regeneration decision is approaching.

What is needed for a useful quotation?

Provide the process target, gas and dust data, drawings, dimensions, quantity, service history, failure evidence and required outage or delivery schedule.

REQUEST A POWER PLANT TECHNICAL REVIEW

Describe the operating problem, and we will define the data needed next

Send the unit type, fuel, current emission or operating symptom, gas data, equipment drawing and planned decision date. If information is incomplete, start with the available trends and photos.

Discuss your power plant project